The three panels for my piece for marmalade cafe toilets are all complete, so below are some images of the installation process as I drill each panel in place and paint the surrounds to follow on the mural piece feel from the rooster to this vege, plant and fruit mix.
It isn't complete yet but its a start-
Stage 1: drilling each panel in place
right panels
left panel
Stage 2: painting right door
left door
full view of the toilet area, so far...